Previous Year Papers

Download Solved Question Papers Free for Offline Practice and view Solutions Online.

Test Series

Take Zigya Full and Sectional Test Series. Time it out for real assessment and get your results instantly.

Test Yourself

Practice and master your preparation for a specific topic or chapter. Check you scores at the end of the test.
Advertisement

 Multiple Choice QuestionsMultiple Choice Questions

51.

The pie-chart given below shows usage of materials in a construction of house. Study the chart and answer the questions.

If the cost of cement is â‚¹ 5,000/-, then the labour cost is

  • ₹ 5,500

  • ₹ 6,250

  • ₹ 9,000

  • ₹ 4,000

33 Views

52.

The pie-chart given below shows usage of materials in a construction of house. Study the chart and answer the questions.

The average of percentages of steel, cement and miscellaneous items used in the construction is

  • 10%

  • 25%

  • 20%

  • 35%

36 Views

53.

The following pie-chart shows the study time of different subjects of a student in a day. Study the pie-chart and answer the following questions.

  • 1 hour 30 min

  • 2.9 hour (approx)

  • 2 hours

  • 3 hours

39 Views

54.

The following pie-chart shows the study time of different subjects of a student in a day. Study the pie-chart and answer the following questions.

If the student studied chemistry for 3 hours, then he/she studied geography for:

  • 1 hour

  • 2 hours

  • 1 hour 30 min

  • 2 hours 30 min

39 Views

Advertisement
55.

The following pie-chart shows the study time of different subjects of a student in a day. Study the pie-chart and answer the following questions.

If the student studied 10 hours in a day, then he/she studied mathematics for

  • 3 hours

  • 10 over 3 hours

  • 1 third hour

  • 3 over 10 hour

40 Views

Advertisement

56.

The following pie-chart shows the study time of different subjects of a student in a day. Study the pie-chart and answer the following questions.


Instead of 10%, if the student spends 15% to study other subjects and the time is taken from the time scheduled to study mathematics and if he/she used to study 20 hours per day, then the difference of time for studying mathematics per day is

  • 30 min

  • 45 min

  • 1 hour

  • 1 hour 30 min


C.

1 hour

Other hours study = 15%
Then, in Mathematics = 30 - 5  = 25%
Difference =(30 - 25)% =  5%
fraction numerator Total space percent sign over denominator Total space hr end fraction space equals space fraction numerator Difference space percent sign over denominator Difference space hr end fraction
100 over 20 space equals space 5 over straight x
straight x space equals space 1 space hr

36 Views

Advertisement
57.

Study the pie-chart and answer the questions. The pie-chart given below shows the expenditure incurred in bringing out a book by a publisher.

What is the central angle showing the cost of paper?

  • 16°

  • 32°

  • 38.9°

  • 57.6°

46 Views

58.

Study the pie-chart and answer the questions. The pie-chart given below shows the expenditure incurred in bringing out a book by a publisher.

If the cost of printing is â‚¹ 16,800/-, the royalty is

  • ₹ 2,400

  • ₹ 3,200

  • ₹ 4,800

  • ₹ 8,400

36 Views

Advertisement
59.

Study the pie-chart and answer the questions. The pie-chart given below shows the expenditure incurred in bringing out a book by a publisher.

Royalty on the book is less than canvassing expenditure by

  • 25%

  • 50%

  • 24%

  • 12%

43 Views

60.

Study the pie-chart and answer the questions. The pie-chart given below shows the expenditure incurred in bringing out a book by a publisher.

If miscellaneous expenditure amount to â‚¹ 12,000/-, the expenditure on canvassing will be

  • ₹ 80,000/-

  • ₹ 1,44,000/-

  • ₹ 4,68,000/-

  • ₹ 4,05,000/-

36 Views

Advertisement