Previous Year Papers

Download Solved Question Papers Free for Offline Practice and view Solutions Online.

Test Series

Take Zigya Full and Sectional Test Series. Time it out for real assessment and get your results instantly.

Test Yourself

Practice and master your preparation for a specific topic or chapter. Check you scores at the end of the test.
Advertisement

 Multiple Choice QuestionsMultiple Choice Questions

41.

Sunil completes a work in 4 days whereas Dinesh completes the work in 6 days. Ramesh works 1 1 half space times as fast as Sunil. The three together can complete the work in

  • 1 5 over 12 space days
  • 1 5 over 7 space days
  • 1 3 over 8 space days
  • 1 3 over 8 space days
594 Views

42.

Three persons undertake to complete a piece of work for ₹ 1,200. The first person can complete the work in 8 days, the second person in 12 days and third person in 16 days. They complete the work with the help of a fourth person in 3 days. What does the fourth person get?

  • ₹ 180

  • ₹ 200

  • ₹ 225

  • ₹ 225

246 Views

43.

A can do a piece of work in 20 days and B in 30 days. They work together for 7 days and then both leave the work. Then C alone finishes the remaining C alone finishes the remaining work in 10 days. In how many days will C finish the full work?

  • 25 days

  • 30 days

  • 24 days

  • 24 days

142 Views

44.

250 men can finish a work in 20 days working 5 hours a day. To finish the work within 10 days working 8 hours a day, the minimum number of men required is

  • 310

  • 300

  • 313

  • 313

320 Views

Advertisement
45.

2 men and 5 women can do a work in 12 days. 5 men and 2 women can do that work in 9 days. Only 3 women can finish the same work in

  • 36 days

  • 21 days

  • 30 days

  • 30 days

171 Views

46.

P, Q, R are employed to do a work for ₹ 5750. P and Q together finished 19 over 23 of work and Q and R together finished 8 over 23 of work. Wage of Q, in rupees, is

  • 2850

  • 3750

  • 2750

  • 2750

174 Views

47.

If A works alone, he would take 4 days more to complete the job than if both A and B worked together. If B worked alone, he would take 16 days more to complete the job than if A and B work together. How many days would they take complete the work if both of them worked together?

  • 10 days

  • 12 days

  • 6 days

  • 6 days

316 Views

Advertisement

48.

A can do a piece of work in 24 days, B in 52 days and C in 64 days. All begin to do it together, but A leaves after 6 days and B leaves 6 days before the completion of the work. How many days did the work last?

  • 720/29

  • 20

  • 18

  • 18


A.

720/29

Let the work be finished in x days.
∴ Work done by A in 6 days + Work done by B in (x - 6) days  + Work done by C in x days = 1
Use formula:
open parentheses fraction numerator No space of space days space straight a space person space does over denominator No space of space days space straight a space person space can space do end fraction plus fraction numerator begin display style No space of space days space straight a space person space does end style over denominator begin display style No space of space days space straight a space person space can space do end style end fraction plus fraction numerator begin display style No space of space days space straight a space person space does end style over denominator begin display style No space of space days space straight a space person space can space do end style end fraction space equals space 1 close parentheses
therefore space space 6 over 24 space plus space fraction numerator left parenthesis straight x minus 6 right parenthesis over denominator 52 end fraction space plus space straight x over 64 space equals space 1
rightwards double arrow space space space fraction numerator straight x minus 6 over denominator 52 end fraction plus straight x over 64 space equals space 1 minus 1 fourth space equals space 3 over 4
rightwards double arrow space space fraction numerator 16 left parenthesis straight x minus 6 right parenthesis space plus space 13 straight x over denominator 13 cross times 16 cross times 4 end fraction space equals space 3 over 4
rightwards double arrow space space 16 straight x space minus space 96 space plus space 13 straight x space equals space 13 space cross times space 16 space cross times 3
rightwards double arrow space space space 29 straight x space equals space 624 space plus space 96 space equals space 720
rightwards double arrow space space space space straight x space equals space 720 over 29



240 Views

Advertisement
Advertisement
49.

A, B and C can do a piece of work in 30, 20 and 10 days respectively. A is assisted by B on one day and by C on the next day, alternately. How long would the work take to finish?

  • 9 3 over 8 space days
  • 4 8 over 8 space days
  • 8 4 over 13 space days
  • 8 4 over 13 space days
176 Views

50.

2 men and 4 boys can do a piece of work in 10 days, while 4 men and 5 boys can do it in 6 days. Men and Boys are paid wages according to their output. If the daily wage of a man is ₹ 40, then the ratio of daily wages of a man and a boy will be

  • 5 : 3

  • 5 : 2

  • 7 : 4

  • 7 : 4

257 Views

Advertisement