Previous Year Papers

Download Solved Question Papers Free for Offline Practice and view Solutions Online.

Test Series

Take Zigya Full and Sectional Test Series. Time it out for real assessment and get your results instantly.

Test Yourself

Practice and master your preparation for a specific topic or chapter. Check you scores at the end of the test.
Advertisement

 Multiple Choice QuestionsMultiple Choice Questions

61.

A does 2 over 5 of a work in 9 days. Then B joined him and they together completed the remaining work in 6 days. B alone can finish the whole work in

  • 6 12 over 13 space days
  • 8 2 over 11 space days
  • 10 days

  • 10 days

222 Views

62.

A man does double the work done by a boy in the same time. The number of days that 3 men and 4 boys will take to finish a work which can be done by 10 men in 8 days is

  • 4

  • 16

  • 7 3 over 11
  • 7 3 over 11
369 Views

63.

A man can do a piece of work in 30 hours. If he works with his son then the same piece of work is finished in 20 hours. If the son works alone he can do the work in 

  • 60 hours

  • 50 hours

  • 25 hours

  • 25 hours

419 Views

Advertisement

64.

The daily wages of A and B respectively are Rs. 3.50 and Rs. 2.50. When A finishes a certain work, he gets a total wage of Rs. 63. When B does the same work, he gets a total wage of Rs. 75. If both of them do it together, what is the cost of the work ?

  • Rs. 67.50

  • Rs. 27.50

  • Rs. 60.50

  • Rs. 60.50


A.

Rs. 67.50

Time taken by A = fraction numerator 63 over denominator 3.50 end fraction space equals space 18 space days
Time taken by B = fraction numerator 75 over denominator 2.50 end fraction space equals space 30 space days
Time taken by A and together to do the work
                    equals space fraction numerator straight A space cross times space straight B over denominator straight A space plus space straight B end fraction space equals space fraction numerator 18 space cross times space 30 over denominator 48 end fraction space equals space 45 over 4 space days
∴     Total wages
    equals space Rs. space 45 over 4 space cross times space left parenthesis 3.50 space plus space 2.50 right parenthesis
equals space Rs. space open parentheses 45 over 4 space cross times space 6 close parentheses space equals space Rs. space 67.50
  


498 Views

Advertisement
Advertisement
65.

John does 1 half piece of work in 3 hours. Joe does 1 fourth of the remaining work in 1 hour and George finishes remaining work in 5 hours. How long would it have taken the three working together to do the work?

  • 2 1 over 7 space hours
  • 3 1 over 7 space hours
  • 3 8 over 11 space hours
  • 3 8 over 11 space hours
491 Views

66.

15 men can finish a piece of work in 40 days. The days after which 5 men should leave the work so that the work is finished in 45 days altogether is

  • 10

  • 20

  • 30

  • 30

94 Views

67.

If 35 men finish a piece of work in 8 days, then the number of men who can do the same work in 10 days is

  • 38

  • 28

  • 19

  • 19

97 Views

68.

A, B and C contract a work for ₹ 440/-. Together A and B are to do 9 over 11 of the work. The share of C should be:

  • ₹ 75/-
  • ₹ 90/-
  • ₹ 100/-
  • ₹ 100/-
92 Views

Advertisement
69.

If 7 spiders make 7 webs in 7 days, then 1 spider will make 1 web in how many days?

  • 1
  • 7 over 2
  • 7

  • 7

100 Views

70.

A can do a piece of work in 9 days while B can do it in 12 days. A and B together can do the work in 

  • 5 1 over 7 space days
  • 5 2 over 7 space days
  • 6 1 over 7 space days
  • 6 1 over 7 space days
81 Views

Advertisement